Sludge (hydrous 78-85%) was directly incinerated
Engineering situation:
Simple equipment, less investment, installed in the silo mixing and carriage device of sludge water by stronger adaptability, high pressure pump sludge fluidized is strong, directly into the furnace combustion more fully, the introduction of flue odor in the bin fan site, no smell, reasonable layout, elegant environment.
Engineering project:
Ningbo Guangyao thermoelectric, Shanghai Petrochemical Thermal Power Station, Qilu Petrochemical refinery, Yanshi Huarun, Nanjing power plant, Yulin power plant in Banqiao coal, cement etc..
|
![]() |